The renovations continued at pace as we claim back the various bits of the building and overall site. Throuh a benefactor, The Coach House was refubished and the upper level became an IT Suite. Work carried on and off in The Kitchen, the main issue was Covid.

  • 30th April 2021

    30TH APRIL

    The Weekday Warriors have been surprisingly camera shy this week but the results of their work remain clearly visible. They have been hard at work clearing out wet and dry rot in the store room (aka Room Of Doom!). Not very sexy but absolutely essential going forward. Have a peek at our Renovation Diary.

    30TH APRIL

  • 23rd April 2021

    23RD APRIL

    Whilst the concrete is drying, the guys are working to restore The School Room after the new extraction unit has been installed. There's a few piccies in our Renovation Diary.

    23RD APRIL

  • 16th April 2021

    16TH APRIL

    With the concrete currently drying, the Warriors have been limited in what they can do. With the school returning soon, the Warriors re-started work to finalise the floor round about the chimney which now has the new extractor. See our Renovation Diary.

    16TH APRIL

  • 9th April 2021

    9TH APRIL

    The guys have been busting a gut this week to get the concrete laid in The Kitchen, hallway and The Store Room. Working to 12.25am (yes in the morning), the prep work was completed. They were back again at 8am to lay the concrete. See our Renovation Diary to get a flavour of their achievement!

    9TH APRIL

  • 2nd April 2021

    2ND APRIL

    The Kitchen has taken more steps forward with the team putting in the protectors required for the power and getting the floor ready for concreting. And there were quite a few deliveries too! Its coming together quickly now. See our Renovation Diary to see what has been happening down at The Swan.

    2ND APRIL

  • 26th March 2021

    26TH MARCH

    RAS are in to start the riser for the kitchen extractor. The area they will be working in is the schoolroom to get this ready for after Easter GR6.

    The Warriors have been busy this week, why not have a peep at the Renovation Diary to see what else has been happening.

    26TH MARCH

  • 19th March 2021

    19TH MARCH

    The Warriors were hard at it again preparing for the installation of the kitchen extraction system. The kitchen equipment started to return including a new pizza over. And the lads chalked out the final plan to ensure no mistooks. See the Renovation Diary.

    19TH MARCH

  • 12th March 2021

    12TH MARCH

    The Warriors have had to leap tall buildings this week having removed the stairs between the ground floor and The School House above. The stairs will be replaced very soon. See some photos in our diary entry for 12th March.

    12TH MARCH

  • 5th March 2021

    5TH MARCH

    Work has continued in The Kitchen and The Storeroom to prepare the walls and floors for the next stage. This has taken a lot of back breaking work moving screed from The Courtyard to where it is needed. Deliveries of raw materials for the next stage have also started appearing. You never know, the kitchen itself might be next.

    Our diary for 5th March.

    5TH MARCH

  • 26th February 2021

    26TH FEBRUARY

    Various members of the team and contractors were in last wekend and completed the rebuild of the backwall of The Kitchen.

    During the week, the lads have been working on filling in the gap created by moving The Kitchen fireplace and levelling the floors.

    Our diary for 26th February.

    26TH FEBRUARY

  • 19th February 2021

    19TH FEBRUARY

    The rebuild of The Kitchen is in full flow. Improving the brickwork and installing new lintels. It's full steam ahead for the Weekday Warriors. Want to become one? Everyone welcome!

    See the diary for 19th February.

    19TH FEBRUARY

  • 12th February 2021

    12TH FEBRUARY

    The week work to be th steels in started. And we saw some magnificent driving to get a rather large tipper truck into The COurtyard to remove all the debris from The Kitchen and backrooms.

    See our diary for 12th February.

    12TH FEBRUARY

  • 5th February 2021

    5TH FEBRUARY

    The Weekday Warriors have continued their work in the depths of The Swan. They have continued clearing away and prepping in The Kitchen, The Store Room and in The Hallway. The Room of Doom is no more.

    See some photos and info in our diary for 5th February.

    5TH FEBRUARY

  • 29th January 2021

    29TH JANUARY

    The guys have continued with the other backrooms and also The Kitchen. We are almost at the point where the contractors can walk in and finish it off in a few weeks (LOL).

    See more of the photos and details in our renovation diary page for 29th January.

    29TH JANUARY

  • 22nd January 2021

    22ND JANUARY

    The new kitchen windows were delivered! A great piece of work by Windsor Joinery. Along with that, the guys have digging for gold or for the centre of the earth, we're not sure which. The Kitchen floor is taking a considerable amount of extra effort - typical of a very old building as we are finding out again.

    See more of the photos and details in our renovation diary page for 22nd January.

    22ND JANUARY

  • 15th January 2021

    15th JANUARY

    The Weekday Warriors have continued their work to preapre for the contractors to come in. This week they were digging out the walls where the new steel joists are going. Gertting read for the pads, etc as directed by buildings expert.

    See photos and our weekly report for 15th January.

    15TH JANUARY

  • 8th January 2021

    8th JANUARY

    The guys are back at it after the break and are getting stuck in to The Kitchen floor to take it back to basics. In doing so they made some interesting finds.

    See photos and our weekly report for 8th January.

    8TH JANUARY