Renovation Diary: 10th December, 2021
The Weekday Warriors have taken a well deserved break for much of this week as 'Lino Len' and his team have been onsite laying flooring in The Kitchen, both store rooms and the corridor leading to/from the Bar. Another very significant step forward with sincere thanks to everyone involved.
The Kitchen and The Store Room:
![The Store Room ready for flooring](images2/renovationdiary/2021/past-20211210/20211210-03.jpg)
![In The Kitchen preparing for the flooring to go down](images2/renovationdiary/2021/past-20211210/20211210-02.jpg)
![The team working on The Kitchen floor](images2/renovationdiary/2021/past-20211210/20211210-01.jpg)
The hallway:
![The Hallway from The Kitchen door](images2/renovationdiary/2021/past-20211210/20211210-13.jpg)
![The corridor with the levelling compound drying out](images2/renovationdiary/2021/past-20211210/20211210-11.jpg)
![Team laying flooring in corridor](images2/renovationdiary/2021/past-20211210/20211210-10.jpg)
![The corridor flooring now completed](images2/renovationdiary/2021/past-20211210/20211210-12.jpg)