Renovations Diary: 19th March, 2021

As some of the kitchen equipment starts to arrive the Weekday Warriors have been hard at work preparing the site. Another skip was delivered early this morning as the tidying up continues. With new ceiling joists ready to be secured and a new staircase on order real progress is being made.

The Kitchen extraction needs to go out through The School Room
The exposed chimney breast in The School Room

Meanwhile down below in The Stock Room there was some progress with the damp proofing on the external walls.

The Store Room with damp proof membrane on the walls
Still need to do the outward facing wall

The clearout has started to tidy up The Courtyard for the re-opening hopefully on April 12th. Also we need to dump a lot of rubbsih from the renovation activities. The answer: a skip was required as we have so much bumf.

Another skip has arrived
Pile of rubbish destined for the skip

The team have also inserted SFJC Safety Fast Joist Caps into the backwall that will then be used to further support The School Floor at the point The Kitchen extraction transits through. In the nicer weather, the lads were treating the rafters before insertion.

The lads preparing timber for The Kitchen
Treating the timber just in case
New joist caps into which new rafters will be inserted.

And McFarlane Telfer delivered a number of The Kitchen appliances with have been securely stored away. Did we mention the pizza over? This is going to add a lot to our food offering when The Kitchen is opened fully.

Lexie showing off the new pizza over (well, it is all wrapped up so you need to imagine

And it was one young's birthday too - so the lad celebrated with a couple of well deserved beers at the end of the day.

Is that Tony or not?
Tony enjoying a beer for his birthday

With Easter nearly upon us there is a real feeling of 'spring is in the air' as every working day brings us closer to being able to provide our own food service.