Renovation Diary: 8th October, 2021
With Ian Gray finishing plastering in the kitchen, dry store and stairwell corridor Richard the decorator has applied the first mist coat of paint. As the kitchen continues to take shape the Warriors have been giving it a good tidy up and planning the drainage around the cellar hatch.
Other Swan Heroes have been busy installing new electrics for the covered area heating and extending the fire alarm and CCTV systems. With the weather turning and dark nights drawing in the Warriors have needed to catch up with some much needed building repairs and remedials around the pub and courtyard.
Meanwhile inside the bar there was a bit of a tidy up and putting out the blankets as the nights are now drawing in.
Meanwhile The Coach House got some new rugs and the plants at the front door a little attention.