Renovation Diary: July 2021

Week 26/21: 2nd July 2021

This week the Warriors were joined in their endeavours by our genial host Micky, who decided on his day off to don his site gear and get stuck in as well. This gave the opportunity to deal with some snags and running repairs needed around the bar area.

Micky hard at it
Shows new and old rafters side-by-side

Elsewhere the Warriors have continued with the painstaking and meticulous work of reinforcing the kitchen ceiling joists in preparation for boarding. With this next phase of work looming Ron Smith from RAS Installations is visiting site to finalise plans for the design, fabrication and install of the main extractor canopy.

New reinforcing beams going in
Temporary sink now working
Late in the evening the kitchen looks eerie
Wires hanging from the sealing
Additional new rafters in siut

Week 27/21: 9th July 2021

Another week of work in the kitchen for our band of Warriors. Beams on the window side of the kitchen ceiling have been reinforced, no easy task with the first fix already in situ.

Ian fireboarding
Richard fireboardng in stairwell
Fireboarding up high
More work on the kitchen ceiling

With the GR6 pupils now out for the summer work has continued to provide acoustic insulation in the stairwell and, soon, the kitchen to ensure that pupils and staff in The School House are not disturbed once the kitchen is in full swing.

Week 28/21: 16th July 2021

Warrior work on reinforcing the remaining area of kitchen joists has continued with the team working in relay, Tony cutting a threaded bar to be used to bolt them together, Trevor and Ian then bolting and clamping new joists into place and Trevor finishing off by sealing each into the wall with mortar.

Cutting threaded bar to length
Working in the ceiling is hot work
Tightening up fixing bolts

Sane or not? That is the question. The flashing over the backdoor needed some modifications after the latest downpours. The lads got a good day for it and managed to enjoy themselves too.

Cutting threaded bar to length
Working in the ceiling is hot work
Tightening up ficing bolts
Tightening up ficing bolts

Week 29/21: 23rd July 2021

On the Monday we had a squad of volunteers in to spruce up The Courtyard and get prepared for the Soul Duo, the band playing before we started, and also the presentation area. Given numbers, we also fixed up some tables and altered the layout slightly but still in keeping with old covid restrictions.

Sanding a table
Fixing one of the bobbine tables
Sweeping The Courtyard
Clackening the sign board
Bar staff paiting a new board
COmpleted divider now with advertising
Swan logo being added to the new dart board

Meanwhile up on the roof, new volunteer Thomas was working on the roof which has been needing some ove for quite a while.

Repairing the roof tiles
Our new volunteer - Thomas - welcome
Repaired flashing
Roof repaired at the chimney breast

Meanwhile down in The Kitchen, the guys were installing acrows to let them complete the necessary work in the ceiling.

Ian and TOny installing an acrow
One holds, the other turns to raise the acrow into place

Week 30/21: 30th July 2021

A little bit of everything this week from our volunteer warriors. The front wall has been painted and a new brick flower bed is under construction for Bez and other green fingered enthusiasts.

Re-pointing the front wall
John re-pointing the front wall
Front wall re-pointed and whitewashed
Flower beds at the front of the wall
Power team - John and Big Alan
Lads happy with their work
Mixing cement for the front wall

Work to patch the roof around the chimney continues when the weather permits.

More reflashing on the roof
Professional job at blending in the new flashing
And then capped off good for another hundred years or so

At ground level work to enhance the tables in The Courtyard is already improving the visitor experience.

Making the new bobbin table top
Cutting to make a perfect circle
The finished item - wow

Indoors work to repair the door frame and lintels where the dry rot has been removed is nearing completion.

Area looks more like a bomb site at the moment
Widening the door
Ian and Trevor working on the door lintel