Renovation Diary: July 2022
28th July, 2022
Building work has continued in the stables these last few weeks and now the final touches are being made to the internal doors, paintwork and second fix electrical. Security is already in place.
The end result will gift The Swan with a series of usable spaces available to the community as a whole. This refurb has been funded by The Green Room School and during school hours the stables will provide a shop space (for students to sell their wares), a considerable workshop space for creative projects as well as an area for reception.
The internal designs have been considered with a wide variety of purposes in mind. These spaces will be open to the community to hire for classes, meeting areas and general use as a workshop for those larger projects that require a more suitable workspace.
The Windsor Cycle Hub has secured funding for a portion of the upgrade to stable 5 which will be its base for the bike kitchen and work with bringing cycling to the community. Keith & John from the WCH have nearly finished pointing brickwork and decorating Stable 5 which by should shortly be ready to accomodate the WCH equipment.