Renovations Diary: 29th November, 2019

Work continued on The Stables to make them water tight and improve the overall appearance. This is to make the stalls safe and look good. There is still much work to be done.

The floor at the foot of the internal stair case was permanently fixed. This took the volunteers a lot of effort to remove the temporary solution and make it good.

Some further work was carried out in the gents toilet. Fixing the last of the fireboard to the small patches that had been left. Also mounting an excellent picture donated by John Symon.


Ian fixing flooring

Just at the entry to the back of the pub

Lovely new painting in the gents

Donated by John Symon

Professional roofers started

Working on The Stables

Fixing last bits in the gents

Adding fireboard to last gaps in the ceiling

Moving furniture around

To see how we maximise the space

Even volunteers need to relax

Bas and Diana playing Yahtzee in the pub

final solution implemented

For the bottom of the internal stairs

New coat hooks (now gone)

Coat hooks were mounted low down, on reflection a safety hazard for kids and were removed