Renovation Diary: September 2019

6th September 2019

Probably the biggest news of this week is that the scaffolding has started to come down. Okay it is only a small bit, but it is a start. This was around the entrance to the school room. Also the iron railings were welded back on after making some small repairs.

And the sparkies have been hard at this week connecting up the cellar, the bar, the toilets and the school room. They have a little work to do behind the scenes to connect up the boiler and heating, but they are ready for the fire and security equipment to be connected up tomorrow. In a couple of weeks they will set-up the wifi.

The team have also been busy putting fire doors on the toilets, varnishing the school room floor, further stripping of the front windows, plaster boarding in the hall, and working to commission the gents toilet (very soon guys, honest).

Finishing the bar plumbing

Scott the Plumber behnd the bar

School room all lit up

All the lights were switched on

Warren removing scaffolding

Over the school entrance

Welding back the steel plate

Guys from Its a Steel did the work

Fitting the fire system

Final alarm box being added

Pete our builder

Photographed with the newly returned pub sign

New ledges to the front windows

Lots of odd angles and squint walls

Wiring up the bar fuse box

Hidden in the main hall

Cooler in cellar now working

Cellar wiring was finished

Return of the pub sign

Had the metalwork added by Its A Steel

The metalwork specialists

Team from Its A Steel

King of the rubbish pile

Searching for the metalwork

Downlighters being tested

In the school room

Varnishing the school room floor

John and Trevor

Fitting a fire door

Pete adding the outer ladies fire door

Added fire board to hall

Next to the school room

Adding the railings

Its A Steel welding outside the school room

13th September 2019

Scott the plumber has been hard at it this week:

  • commissioning the gents toilets
  • connecting up the school's kitchenette
  • mounting the radiators in the school room
  • installing the glass machine in the bar, and
  • installing the ice machine in the cellar.

The equipment took slightly longer than planned, but there was a huge cheer when he appeared from the cellar with a handful of ice.

If you have been in the pub, there have been a number of paint trials going on. Some successful, some less so and have been changed.

Plans for the next couple of days include:

  • grouting the gents, sealing it, and adding the cistern,
  • painting in the bar and toilets,
  • cutting and attaching the skirting, and
  • adding the bar front.

We've heard it a few times in the last couple of weeks ... it's starting to look like a real pub. Give us a few more days and it will be even more so and with the new sign hanging outside the door (being installed this afternoon), hopefully it is somewhere we are all proud of.

Before the green is added

Can't wait for the floor covering to be removed

Installing the school kitchenette

Pete getting stuck in before the school opens

Lexie with fetching headwear

An old polythene bag

Radiators now installed

In the school room

Last of the plastering in the bar

Ian Gray doing the finishing touches

Bas scraping away

At the front window

Pub looking good

Now with tables and chairs inside

Trialing the green paint

Marilyn using test pots in the bar

Cool green on some walls

But will probably change

Directly behind the bar

Plasterboarding next to the stairs to first floor

Giggling wire strippers

Weather still good so girls are down stripping

First of the ice

Scott the Plumber with ice from the newly commissioned machine

Ready for the quiz night

Lots of work was required to ready the pub for the quiz

Lexie with more boron

Multiple coats by mulptiple people to kill the dry rot and mould

Bes painting

In the pub area

Ian chuffed with his stripping

Of the front windows

And Tony involved too

Windows have taken up significant resource and time

20th September 2019

Project Manager's Report

We have had a Productive week at The Swan.

The men's urinals are now up and running and we have started decoration to the men's loos.

We have sourced some really lovely Moroccan style mirrors for ladies room and it has given the room the wow factor . We still have decoration touch ups to do.

Next week we will be fitting the baby change units to both the men’s and ladies toilets.

The skirtings have been cut to size and are ready to fit.

We now have WiFi and a television in situ which is a real milestone.

The electrical works are almost complete and the external wall lanterns that have been lovingly restored by Baz and Diane will be fitted today.

We have been working on the main windows that we will start painting next week.

The school room opened its doors this week and looks fantastic and we have already had some interest from people looking to rent the space.

Pete our resident builder will be back next week and is going to complete the bar and start creating some fabulous window seating.

We have radiators ! All have been fitted now and will be connected and working next week.

The Swan opened its doors on Monday morning and nobody seemed to mind being amongst our regular volunteers armed with hammers, drills and paint brushes . We now serve delicious cakes and coffee from 9.30 am.

Have a super weekend.

Marilyn x

Coffee and cakes from 9:30am

New coffee machine and cakes stand filled with goodies

Flush test in gents

New urinal being tested with water

School room ready for action

Tables, chairs and sofas looking good on polished floor

Where to put the mirror?

Three of the team discussing where th mirror should go in the ladies

Lindsay Court guessed weight of the copper

Competition winner receivng prize from Matt, the bar manager

School room briefing

Members of the Green Room School receiving briefing about the new school room

New mirror in the ladies

Looking very swish now

Marilyn removing another test

Test of a bright yellow didn't go well

School room briefing

Before the school opened all staff attended a meeting

Ladies outer room

Mirrored up and paint touched up

27th September 2019

We have had a very busy week. First a big thank you goes to all our volunteers for this week. Without these people the pub would not be at the stage it is. We've even had visitors from America helping us out!

A big milestone has been the installation of our new sign hanging proudly where it belongs. Many thanks to Peter our builder, Warren the Scaffolder, and the team who installed this last Saturday.

Inside the pub we now have in place the new corrugated front, to our bar. Also we now have the new keg serving bridge in place, which is very smart indeed. The external lights for the doorways been wired in and lit. Bas and Diana certainly did an excellent piece of restoration with them!

The school room is nearly completed. The guys from the Green Room are settling in nicely. As you can see, the desks and chairs can be set up in a variety of styles dependent upon the needs of the actual lesson - this is extremely important.

Site clearance is still going on and a massive push for this next coming week. We are trying to remove as much building materials and waste from the site as possible. This will improve the overall look and feel.

Fixing the skirting

Adrian lying on floor fixing the skirting to the wall

Renovated school room

Looks the part and all new

New bar front installed

Stylish corrugated aluminium

Diana cleaning an old pew

Several pews have been donated

External lamps were mounted

Painted in The Swan coours by Bas and Diana

Skirting fitted and painted

All in magnolia

Team drinks on Friday

Volunteers having a few drinks on a Friday evening

Rejuvenating the external sign

Bes scraping off all the old paint

Picture hides a cupboard

Picture of Windsor hides a cupboard in the school room

Filling the windows

Tony with builders caulk

Ian filling holes

In one of the window frames

Side door cleaned up a bit

Old cables removed, lamps added, just needs painted now

Gents toilet

Dark grey and bare brickwork make it look stylish

A wee bit thirsty

One of our doggy visitors staring at a pint

Alan from the USA

Painting the skirting

Installing new bridge

Made of shiny copper

Touching up the walls

Liz touching up marks made by the electricians

Kelly got involved too

New barmaid helping out painting

Adrian attacking the windows

More painting of the front windows

The pub sign returns

On a beautiful sunny day