Events Diary: Volunteers AM
Focus for the day was painting ... the bar, more bar, and even more bar! The aim was to get the ceilings and walls/pillars finished to allow the bar floor to be laid in the following week. We succeeded - huge thanks.
As well as painting, the team took on other tasks:
- Pulled down the ceiling in the stock room and hall.
- The usual wire stripping.
- Preparing the chimney breast for pointing.
- Plastering.
- And preparing fo that night's BBQ and music.
Thanks to all who came down.