Events Diary: Volunteers AM
A very windy Saturday curtailed activities and required some fixing of the roof. However that did not dampen the spirit of the volunteers who stuck in during the morning. There was still a lot to do and as usual the team approached it with gusto.
- From pulling down another ceiling in the hall area,
- to making a start to the cleaning of the kitchen ceiling,
- actually painting the bar ceiling,
- more localised stripping of the bar windows to wire stripping
- And tidying out the stables too!
Planning is undeway for the next morning so we can keep the pace going and finish the bar area ASAP.
Taking cover from the weather

Instructions on what was required

Repairing one of the chimnies

Patricia wire stripping

Misting the last of the new plaster

Everything sorted in the stables

Team working in the bar

Wire stripping

Bas making repairs

Matt and the team

Found in the ceiling

Room in the hall area - minus ceiling

Tea break

Nitromores for localised treatment

Painting the bar ceiling

Terry with his find
