Renovation Diary: 25th February, 2022

Taking advantage of the half-term absence of GRS students, the Warriors have insulated and soundproofed the extractor which passes up from The Kitchen and through the School Room. Not wasting anytime after her return from Ghana, Lexie was soon busy applying a finishing coat of paint to the steel installed long before the tiling and grouting reached such an advanced stage of nearing completion.

Lexie painting the main steel girder in The Kitchn
The gap between the cooker hood and the gorsder is just enough to get a head in
Lexie twisting to get into the girder to paint it
Almost done, at the end of the girder not obstructed by the cooker hood
One corner of The Kicthen fully tiled, just to be grouted
Tony doing the fiddly tiling round the windows
Lagging the extrator output in The School House