Renovations Diary: 20th December, 2019

Even though it is the build up to Christmas, work carried on with the pub. Two key things were achieved this week: firstly the professionals were called in to sort out the drains; secondly the Weekday Warriors plasterboard the ceiling of the kitchen.

Sorting out the Drains


Internal drain work Looking into the drain
External drain being cleared Installing the lining
Feeding the camera down the pipes Camera operating in the main drain

Weekday Warriors


Standing on a platform to give him height required to plaster ceiling New plaster drying out and new door has been mounted
Closeup showing covered wall and ceiling plastered to the join Adrian tarting the work
Just to do walls now JHolding the sound proofing