Events Diary: Sanding & Clearing
Saturday 30th March was a day to remember. The team were promised sanding and by jove, they got that and more! As well as tackling door frames and windows, there was further stripping activities: this time of the ceilings to get rid of the polystyrene tiles.
Downstairs the team tackled the gents toilet, and also clearing up the bar area which had a lot of debris and also rubble.
Outside the last bits of the planters removed and a general tidy up was done. There were also some tip runs to get rid of the wood pile that was bulding up next to the skip.
There is still lots of preparation work to do before we can start putting the pub back together.
Clearing rubble from the bar area
Lads taking a break in the sun
Usual format for kicking off the sessions
Clearing out the gents toilet
Sanding one of the many door frames
Stripping a bedroom ceiling
Demolishing the gents toilet
Tidying up outside the kitchen
Removing rubble from the bar area
The skip is filling up quickly
A lot of the ground floor is now bare brick
And more sanding ...
Sanding the bannister in the B&B
We are starting to win ...
Dump run
Filling up the van with wood
And more stripping ...
Finishing off what was a planter